The WHSD road maintenance service summed up the results of the summer season 2022
28 october 2022
News
Regardless of the time of year, the highway requires daily careful maintenance. But it is the summer season (which is wider for road builders than the calendar summer) that is a hot time, both in the literal and figurative sense of the word. After all, during this time it is necessary to have time to carry out the main planned work on the maintenance and repair of the road in order to ensure the comfort and safety of users.
The road was repaired on the WHSD, eliminating abnormal rutting and laying more than 192 thousand square meters. m of new asphalt concrete. The work was planned taking into account the intensity of traffic and was indicated by road booms for tens and hundreds of meters. We also carried out work to replace expansion joints and restore the paintwork on the frames of TSODD. We replaced metal noise screens with plastic ones and restored the markings on the southern section of the highway. The road service replaced 7.2 thousand square meters. m of screens and more than 17 thousand square meters. m markings.
Related publications